  • If the Add Proctor option is chosen, follow these steps:
    • Fill out all required fields.
    • Select Save.
  • If the View Proctors option is chosen, follow these steps:
    • Use the Search feature to locate the project the Proctor will be related to,
    • then select the View Proctors link for that project.

                                     or

    • Select View Proctors next to a project on the list of Recent Projects
  • After selecting View Proctors, a list of the Proctors for the chosen project will display.

  • To add a new Proctor
    • select Add Proctor For This Project.
    • In pop-up window, fill all required fields.
    • Select Save.

How to Edit a Proctor

To edit existing Proctor information in MetaFieldä,
§Locate the project with the Proctor(s) you would like to edit
(using the View Proctors option outlined previously).
§Once your project is selected, a list of Proctors for that project
will be displayed.
§Next, select the Edit button
in the same row as the
Proctor to be edited. 
§Edit appropriate information
within the pop-up.
§Select Save.
Proctors can also be Deactivated or Deleted on this screen
by selecting the corresponding button.
What is the difference between Deactivate and Delete?
§Deactivated = Proctor is unavailable for use on future 
Soil Density tests, and is hidden from dropdown lists in Field. 
It can be re-activated by clicking on the Deactivate/Activate
button (     )
Deleted = Proctor is removed from the system completely.

Proctor Order Display

When assigning a Proctor to a Soil Density test – the Field user selects a Proctor from a dropdown list.
By default, the Proctors will appear in the order they were entered – not necessarily numerical or alphabetical order.
§However, this order can
be adjusted in the Lab component of MetaFieldä. 
To change the order in which Proctors display in the dropdown list, follow these steps:
§Navigate to the Proctor list for a project (see below).
§Select Display Order.
§Drag and drop the Proctors in the desired order.
§Select OK.