...
Default field costs can be assigned to a Work Item. Selecting a Work Item will show the costs structures associated with it in the Costs grid below. To add a default cost structure, click the Add Costs button and define the cost structure (Cost Type, Cost Unit, Cost Per Unit, Notes) in the pop up.
Info |
---|
You are not allowed to have move than one Work Item cost with the same Cost Type AND Cost Unit combination. |
...