Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Using the Done Queue

1.

At the top of the page, use the filter control to show results for only today by indicating today's date in both the start test date and end test date fields. By default, your filter is set to show tests within the last 30 days.

2.Select the Done button to the left. Then select Cast Cylinders.
3.Select a Specimen and edit the results using the Edit Results button.
4.Optional: Revert Test Results from the Done Queue. 
5.Return to the LIMS main screen.

 

Cast Cylinder Diameter Averages

This page within the LIMS module allows a lab to measure the appropriate amount of cylinders to get a diameter average that will be used for the days testing for a specific specimen size. These averages will be auto populated when entering lab results.  

  
1.From the MetaField Main Menu, navigate to LIMS > Cast Cylinder Diameter Averages
2.Use the filters at the top of the page to specify the Lab, specimen size, and date that you would like to enter measurements for.
3.Select Search to determine if measurements have already been added.
4.

If no measurements have been added, select Add Measurements.

  1. Enter in Diameter 1 and Diameter 2 measurements for the number of specified specimens
  2. Select Save.

Info
titleNOTE

The system will automatically populate the number of measurements needed to calculate the daily average based on the number of specimens that need to be tested.

 

Soil Proctor Results

Add a Proctor

1.Navigate to LIMS > Soil Proctor Results.
2.

Add a Proctor using the Add Proctor button. At a minimum, supply the following required fields:

  1. Project Number (proctors may only be entered for active projects).
  2. Assign it a Proctor ID.
  3. Soil Classification (defined in the Administrative module).
  4. Optimum Moisture (%).
  5. Maximum Density (pcf).
3.

OptionalDefine any other fields you wish to include information on. A few of the fields need to be defined elsewhere first such as:

  1. Standards, Methods, Source, and Geologic Origin (defined in Administration > LIMSs > Soil Proctors)
  2. Family Curve (defined inLIMS > Soil Proctor Results > View Proctors > Add Family Curve For This Project)
4.Save the Proctor.
5.Return to the LIMS main screen.

...