...
Project Specifications | |
---|---|
1. | From Home, navigate to Project Administration > Specifications. |
2. | Enter search criteria to locate a project. Select Search. |
3. | Choose a project from the Search Results grid. Try to choose one with a Set Parameters link (i.e., it doesn't yet have any parameters configured). If there is no project with a Set Parameters link, then you'll just have to work with a project that already has some parameters configured. |
4. | Click on the Set Parameters View Specifications link to create unique project specifications for this project. |
5. | Under the General tab, select Edit and select an Owning Office. This will now be the default office when a report is created on the project. This will also allow you to filter by Office in the Scheduling module. |
6. | Under Under the General tab, select Density Testing from the Location Context dropdown.
|
7. | Under the Scheduling tab, enter project related notes for the Technician and Scheduler. The notes will be auto-populated on any work orders created for this project. |
8. | Under the Density Test tab, enter some text in Field Instructions. These Field Instructions will be presented to field technicians as they begin creating a density test in the field. |
79. | Add a Soil Density Test Specification for the project. Enter values in all required fields and click Save. |
810. | Under the Concrete tab, add a new Sample Specification. Enter values in all required fields and click Save. |
911. | Create a set of Specimen Specifications. These will be automatically created when a field tech logs a concrete sample of that size for this project. Additional edits (adding another specimen, removing a specimen) can be done on the field screen. |
1012. | Under the Concrete/Grout Mix Designs tab, highlight a supplier you expect to use on this project. In the Mix Design grid below, enable a mix design that will be used in this project. This will pre-filter the mix design list available to the field technicians so they don’t have to scroll through the long list of all mix designs available for your selected supplier. |
13.11 | Under the Reports tab, |
14. | Under the Distributions List tab, create recipients for this project for the various report types.
|
...