Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • From the MetaField Main Menu, navigate to LIMS > . Select Concrete / Grout / Mortar Work Queues above the dashboard table.
  • Use the Lab filter at the top of the page to select a lab. Make sure the lab selected has data related to it by viewing the grid beneath the filters. Select a different lab if necessary.

...

Add a Proctor

1.Navigate to LIMS > Soil Proctor Results.
2.

Add a Proctor using the Add Proctor button. At a minimum, supply the following required fields:

  1. Project Number (proctors may only be entered for active projects).
  2. Assign it a Proctor ID.
  3. Soil Classification (defined in the Administrative module).
  4. Optimum Moisture (%).
  5. Maximum Density (pcf).
3.

OptionalDefine any other fields you wish to include information on. A few of the fields need to be defined elsewhere first such as:

  1. Standards, Methods, Source, and Geologic Origin (defined in Administration > LIMSs > Soil Proctors)
  2. Family Curve (defined inLIMS > Soil Proctor Results > View Proctors > Add Family Curve For This Project)
  3. Toggle Oversize Rock Field Correction Needed to "Yes", enter in a Specific Gravity and an Absorption %.
4.Save the Proctor.
5.Return to the LIMS main screen.

...