Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Click image to enlarge.

Admixture Unit

The Admixture Unit tab Unit tab is used to store all of the admixture units used in your practice.

...

Click image to enlarge.

Admixture Type

 

 The Admixture Type tab is used to store all of the admixture units used in your practice.

FieldDescription
Type
  • Type of admixture that could be added to concrete.
Tip

Usually contains just the list of admixtures that are added in the Field (versus the plant).

Method of Placement

 

 

Sampled From

 

 

Specified Air

 

 

Specified Slump

 

 

...

The Method of Placement tab is used to store all of the methods of concrete placement (bucket, chute, pump, etc.) used in your practice.

FieldDescription
Name
  • Method of concrete placement.

Sampled From

The Sampled From tab is used to store the places concrete is sample from (chute, mixer, etc.) in your practice.

FieldDescription
Name
  • Where concrete is sampled from.

Specified Air

The Specified Air tab is used to store the the various specified air values that can be selected from.

FieldDescription
Value
  • Specified air value.
  • Only one decimal place allowed.

Specified Slump

The Specified Slump tab is used to store the the various specified slump values that can be selected from.

FieldDescription
Value
  • Specified slump value.
  • Only two decimal places allowed.

Beam Fabrication Method

The Beam Fabrication Method tab is used to store the the fabrication methods used for beams in your practice.

FieldDescription
Test Method
  • Beam fabrication test method.