Purpose

  • This section of QC allows you to review Concrete Tests as well as build and finalize reports.
  • When you first start using QC, you will need to search for a project from the project search panel.  Recent projects you have worked with will display below for easy access. 
  • Select View Tests to open the project and see the associated Tests.

...

StepDescriptionExample
1.Mark the check boxes in the Concrete Samples table for and Samples to be included.

2.Select Preview Pour Summary Report or Preview Specimen Report (pending which report is being created) to validate the content.

3.

Finalize Report to generate the report and save it in the Deliverycomponent or Select Craft Draft Report to send it to Quality Control Draft Report section.

Info
titleReport Dialoge

When you select either option for generating a report, a prompt page will load.

FieldDescription
Starting Report Number
  • Only displays if report numbering is turned on for your organization and this is the first report created for this project
  • Allows you to set the first number for this report type. If no value is added, system will start with 1.
  • Enter a whole number from 1-999,999
Report Note
  • Enter a note that will display on the final report
  • Maximum number of characters is 25
Alternate Title
  • This field will only display if the report has been configured by your Business Administrator to allow Alternate Titles
  • If allowed, this is an optional field
Report Label
  • Select a Report Label from the dropdown
  • Report Labels are controlled by your Buisness Administrator
  • This is required field
DescriptionYou may type in a description
  • Description is for internal use only and will not display on the report
  • Will default to the Sample, Set -and Specimen numbers that are being reported (i.e. 38included on the report (e.g., 47: 1-1, 381-2, 381-3, etc.).
  • You may type in an alternative description
Digital Signature
  • This option will only appear if your Administrator has permitted this type of report to be digitally signed
  • This option will not appear when creating a Draft Report

...