Field | Description |
---|
Contractor | - Name of the concrete contractor
|
Supplier Plant Mix Design | - The supplier and plant supplying the concrete
- The mix design used for the application
- Click the Lookup button to select suppliers, plants and mix designs
Tip |
---|
See the Using Supplier / Plant / Mix Design section at the bottom of this page for more information on managing the data in these fields. |
|
Truck # | - Truck number delivering the concrete
|
Ticket # | - Ticket number for the concrete
|
Load Volume | - Amount / volume of concrete in the load
|
Method of Placement | - How the concrete is being placed (chute, buggy, pump, conveyor, etc.)
|
Time Batched | - Time the concrete was batched
- Use the Specify Date link under the field label to specify a date if it is different than the Cast Date previously supplied (i.e. used mostly if placements happen over midnight)
|
Time Arrived | - Time the truck arrived
- Use the Specify Date link under the field label to specify a date if it is different than the Cast Date previously supplied (i.e. used mostly if placements happen over midnight)
|
Time Truck Empty | - Time the truck was completely empty
- Use the Specify Date link under the field label to specify a date if it is different than the Cast Date previously supplied (i.e. used mostly if placements happen over midnight)
|
Air Temp | |
Weather | - General weather conditions
|
Est. Wind | |
Est. Humidity | |
Placement Notes | - Open-ended notes pertaining to the placement
- Reported on reports / visible to clients
|
Batch Log Section - Grout / Mortar
There is more variability in the fields presented for grout / mortar placements. The fields available are dictated by the Batching Type (on-site, pre-mixed, ready-mixed) on the placement.
Batch Log Section - Concrete Sample Types
Field | Description |
---|
Contractor | - Name of the concrete contractor
|
Batching Type | - How the material is being batched (on-site, pre-mixed, ready-mixed)
- Selected value will dictate what fields are presented in this section
|
Batching Type = Batched On-Site |
Method of Batching | |
Cement Source | |
Cement Type | |
Lime Brand | |
Lime Type | |
Cement Quantity / Unit | |
Lime Quantity / Unit | |
Sand Quantity / Unit | |
Batching Type = Pre-Mixed Material |
Manufacturer | |
Product ID | |
Batch ID | |
Batching Type = Ready-Mixed |
Supplier Plant Mix Design | - The supplier and plant supplying the concrete
- The mix design used for the application
- Click the Lookup button to select suppliers, plants and mix designs
Tip |
---|
See the Using Supplier / Plant / Mix Design section at the bottom of this page for more information on managing the data in these fields. |
|
Truck # | - Truck number delivering the concrete
|
Ticket # | - Ticket number for the concrete
|
Load Volume | - Amount / volume of concrete in the load
|
Method of Placement | - How the concrete is being placed (chute, buggy, pump, conveyor, etc.)
|
Time Batched | - Time the concrete was batched
- Use the Specify Date link under the field label to specify a date if it is different than the Cast Date previously supplied (i.e. used mostly if placements happen over midnight)
|
Time Arrived | - Time the truck arrived
- Use the Specify Date link under the field label to specify a date if it is different than the Cast Date previously supplied (i.e. used mostly if placements happen over midnight)
|
Time Truck Empty | - Time the truck was completely empty
- Use the Specify Date link under the field label to specify a date if it is different than the Cast Date previously supplied (i.e. used mostly if placements happen over midnight)
|
Method of Mixing | |
Air Temp | |
Weather | - General weather conditions
|
Est. Wind | |
Est. Humidity | |
Placement Notes | - Open-ended notes pertaining to the placement
- Reported on reports / visible to clients
|
| If you have a concrete placement happening over midnight, the + control in the following fields can be used to assign a date to the time. For example, if the concrete was batched at 11:45 PM and arrived after midnight, assigning the date in addition to the time ensures that the placement time calculation is accurate. - Time Batched
- Time Arrived
- Time Truck Empty
|
...