...
Field | Description | ||||||
---|---|---|---|---|---|---|---|
Contractor |
| ||||||
Supplier | Est. Humidity | Used to record site conditions
Example for selecting an item from the predetermined list: Example for adding a new value that is not in the predetermined list:
| |||||
Truck # |
| ||||||
Ticket # |
| ||||||
Load Volume |
| ||||||
Time Batched |
| ||||||
Time Arrived |
| ||||||
Time Truck Empty |
| ||||||
Air Temp |
| ||||||
Weather |
| ||||||
Est. Wind |
| ||||||
| |||||||
Truck # |
| ||||||
Ticket # |
| ||||||
Load Volume |
| ||||||
Method of Placement |
| ||||||
Time Batched |
| ||||||
Time Arrived |
| ||||||
Time Truck Empty |
| ||||||
Air Temp |
| ||||||
Weather |
| ||||||
Est. Wind |
| ||||||
Est. Humidity |
| ||||||
Placement Notes |
|
If you have a concrete placement happening over midnight, the + control in the following fields can be used to assign a date to the time. For example, if the concrete was batched at 11:45 PM and arrived after midnight, assigning the date in addition to the time ensures that the placement time calculation is accurate.
|
...