FieldDescription

Field Instructions

  • Any information added to this box will display to Field users when adding a new concrete / grout / mortar sample.

Sample Specifications

  • Specifications (strength, air, slump, consistency, etc.) are defined for sample types, placement locations, and mix design combinations.
  • Parameters set in Project Specifications will default in Field when a technician adds a sample with a corresponding pour location and mix design.
Tip
titleLocation List

If you have set locations on the General tab of Project Specifications for this project, by default the list of locations will be filtered to only those chosen. If you want to see the list of all locations, you need to remove this filter.

Specimen Specifications

  • You can set up the default specimen settings by Sample Type and Size.
  • When Technician adds a new Sample Type with the corresponding Sample Size in field, corresponding number of specimens and test ages will default in Fileld.
  • The Technician can override these values in Field if needed and they have the appropriate permissions to do sopermission level.
Correction Factors
  • Contains project-level default correction factors
  • The global correction factors defined in Admin can be copied using the Copy Global Correction Factors button so you don't have to build the entire correction factor table from scratch

...