Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Table of Contents
Table of Contents

Purpose

Bituminous material that bituminous nuclear gauge tests are performed on is managed here.

FieldDescription
Material
  • Name / description of the bituminous material
  • Generates the list of bituminous materials selected in the Field module
Require Maximum Specified Compaction
 
  • Select this box if you would like Specified Maximum Compaction values entered
Minimum Specified Compaction (%)
  • Minimum specified compaction % of the material
Maximum Specified Compaction (%)
  • Maximum specified compaction % of the material
Requires Retest
  • Indicates if a retest of the material is required if the compaction test falls outside the minimum / maximum compaction range
Tip

Specifications stored in Project CGM Specifications trump specifications stored here.


Image Removed
Click image to enlarge.Image Added