Purpose
This section of QC allows you to review Density Tests as well as build and finalize reports. When When you first start using QC you will need to search for a project from the project search panel. Recent projects you have worked with will display below for easy access. Select Select View Tests to open the project and see the associated Tests.
Click on image to enlarge.
Info | ||
---|---|---|
| ||
Only projects with Density Tests will have a View Tests link. |
...
Density
...
Test Filters
To limit the test results displayed, you may set various filters in the filter pane and select Filter. These filter settings will be retained until you select Clear All or Logout.
Click on image to enlarge. or navigate away from the page. To save a commonly used filter set, apply filters accordingly and select Save Filter.
Edit Density Test Results
To edit a Density Test, select the pencil icon next to the test. This will open the test for editing. Depending on your permissions you will be able to edit various fields.
Tip | ||
---|---|---|
| ||
Not all fields are available for viewing from the Test Review table. Opening the test for editing will allow you to review all test data. |
Click on image to enlarge.
Info | ||
---|---|---|
Info | ||
| ||
Multiple test can be edited at once by checking the box then clicking the Batch Edit button. |
Info |
---|
Only users assigned to a security role (General - Roles)with the DensityTestAdministrationManage Density Field Test Data permission are allowed to make changes in the Test Data section. SeeOnly users assigned to a security role with the Manage Density Test Date permission are allowed to make changes to the Test Date field. See your MetaField administrator regarding assignment of this permission should your business workflow require this. |
Tip |
---|
The Retest Not Required check box can be used to indicate that a test does NOT require a retest in the event the business rules determined a retest should be performed. |
Certain Density tests may allow for image plotting on the uploaded proctor curves file. Please note that only image file types may be plotted on. PDF file types can not be manipulated.Image Plotting
Field Notes
If a technician has added Field Notes to a Test, an icon will display on the Test Review table.
Click on image to enlarge.
To view the note, open the test for editing and scroll to the bottom.
Click on image to enlarge.
Related Tests
Related Tests can be added / removed in the QC Edit / Review Screen. If a test is related to another record, this relationship will be indicated on the QC grid. Related tests are only available for Soil Nuclear Gauge, Sand Code and Moisture Content tests.
Select the arrow icon to display the related tests.
Report Comments
You can add comments to a single density test. These comments will display on the client report. To add Report Comments, open the test for editing and scroll to the bottom.
Click on image to enlarge.
Changing Test Status
To update a test status, check the box next to one or more tests and select Set Status Change Status.
Click image to enlarge.
Tip | ||
---|---|---|
| ||
Select the top checkbox to select all tests in the current view at one time. |
Test Status Definitions
Info | ||
---|---|---|
| ||
Only Tests tests in the status of Complete may be added to a reportor Pending can be reported. |
Status | Definition |
---|---|
Analyzed |
|
Pending |
|
Complete |
|
| |
Review |
|
Tip | ||
---|---|---|
| ||
Review can be used if the test review has been started, but may take more time to complete. The The project manager can assign the status as a reminder that he is waiting for information about this test. |
Creating a Density Report
Warning | ||
---|---|---|
| ||
Only tests with the status of Complete may be added to a Sand Cone, Soil Nuclear Gauge, Oven Burn Moisture Content, or Bituminous Nuclear Gauge Report. |
Step | Description | Example |
---|---|---|
1. | Go to Quality Control and select Density Testing. |
Click image to enlarge.
2. | Select the desired project. If you have previously been working in MetaField, the last project selected will display. To view another project, click Change Project. |
Click image to enlarge.
3. | Verify that the test status of those you want to include on your report are set to Complete. |
4. | Check the box next to desired tests.
|
Click image to enlarge.
Click image to enlarge.
5. | (Optional) You can view your report by clicking Preview Report. |
Click image to enlarge.
6. | There are two options when adding tests to a report: |
|
|
Depending on which button is selected and how your Business Administrator has configured your reports, you may see some of the options below.
Field | Description |
---|---|
Report Note |
|
Alternate Title |
|
Report Label |
|
Digital Signature |
|
Click image to enlarge.
|
Click image to enlarge.
|
Info | ||
---|---|---|
| ||
Upon creating a density report, the option to include / exclude the Optimum Moisture Tolerance column on the report will be presented. |
View Legend
Click to enlarge image.
...