Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 15 Next »

Table of Contents

Setting Concrete / Grout / Mortar Project Specifications

Blank Project Specifications

If any field is left blank, the defaults (global settings) specified within MetaField Administration will be used.

FieldDescription

Field Instructions

  • Any information added to this box will display to Field users when adding a new concrete / grout / mortar sample.

Sample Specifications

  • Specifications (strength, air, slump, consistency, etc.) are defined for sample types and placement locations.
  • Parameters set in Project Specifications will default in Field when a technician adds a sample with a corresponding Pour Location.

Specimen Specifications

  • You can set up the default specimen settings by Sample Type and Size.
  • When Technician adds a new Sample Type with the corresponding Sample Size in field, corresponding number of specimens and test ages will default in Fileld.
  • The Technician can override these values in Field if needed.



  • No labels