About

Field workers are often required to submit a report before they leave a jobsite, and/or are required to submit a report of their daily activities to a project manager.
These types of reports are created in Field - Field Reports area.  

There is also a Field Reports area in Quality Control.  Reports created in Field-Field Reports can be accessed in Quality Control  Field Reports.
While Field Reports can be e-mailed from Field, a Field Report is not considered Finalized until marked and sent to Delivery as such in Quality Control.

Reviewing Field Reports

To review Field Reports, follow these steps.

StepDescriptionExample
1.
  • Open Field Reports from the main Quality Control menu.

Click image to enlarge.
2.
  • Search for your desired project. Once you have found the project, click on View Reports
  • If you were previously working with a project, this project will appear by default. To switch projects, select the Change Project button.

Click image to enlarge.
3.
  • Use the filter panel to search for the Field Reports you would like to review.

Click image to enlarge.
4.
  • Mark the box next to a single report and select Preview Report.

Click image to enlarge.
  

Emailed Field Reports

  • If the Field user (who created the report) chose to send an email containing the report, an email (     ) button will be shown on the right end of the table.
  • Select the email button to view additional information, such as the timestamp, recipients, and message text for the message.


Click image to enlarge.

Counter-Signing a Field Report

 
  • Reports that have already been digitally signed by the Field user can be signed a second time in QC-Field Reports using the Counter-Sign button.
  • If signature graphics are enabled, a countersigned report will display two digital signatures, side-by-side, on the final page of the report.
  • If a report has not been signed by the Field user, countersigning the field report will not work. To sign it for the first time, use the Finalize Report option.

To Counter-Sign a Field Report, follow these steps:

StepDescription
1.Select the checkbox for the report you’d like to countersign.
2.Select Counter-Sign button
3.Enter your Digital Signature Username and Digital Signature Password in the popup.
4.Select Sign.
  • After countersigning, a new report will appear in the Field Reports list.  You will see the originally signed report as one list item, and the report containing both signatures as a separate item.
  • To send either report to Delivery for distribution, you will need to Finalize the report.

 

 

Click image to enlarge.

How to Finalize or Create a Draft Field Report

From Quality Control - Field Reports, follow the steps below.

StepDescriptionExample
1.Select the checkbox for the report you’d like to Finalize. 
2.A.

To Finalize a report:

  • Select Finalize Report
  • Complete the required fields in the popup
  • Once finalized, the report will be available in Delivery.

Click image to enlarge.
2.B.
To Create Draft Report:

  • Select Create Draft Report
  •  Complete the required fields in the popup
  • Once saved, the report will be available in Quality Control - Draft Review.


Click image to enlarge.

 

 

 