Administration |
Certifications - Added data extract option / button added to Certification list Certifications - Added data extract option / button added to Certified Personnel list Nuclear Gauges - Added setting to indicate Dry Density / Wet Density as the preferred input variable on density tests General - Added setting to turn off the specimen Pick Up workflow step Work Items - Added the Require Form Tracking setting value to the Work Item grid Roles - Permission nodes added to control access to the new Project Specifications functionality in the Field module AgilePort - Removed the option to hide the Report ID filter (it is necessary to have for report notifications to display the correct report to users)
|
Field |
Density - Added option to enter Dry Density and calculate Wet Density added to nuclear gauge tests - based on settings on nuclear gauge record Density - Added option to directly enter Moisture % added to one point tests Sampling - Added logic to hide the specimen Pick Up workflow step if configured in Administration to hide this Project Specifications - Added functionality to look up C/G/M field specifications without needing to start a new sample Project Specifications - Added functionality to look up Density field specifications without needing to start a new density test
|
Quality Control |
Density - Added option to enter Dry Density and calculate Wet Density added to nuclear gauge tests Density - Added option to directly enter Moisture % added to one point tests Project Search Screens - Added feature to remember last filter variables used (which still need to be applied / searched)
|
Dashboard |
|
Scheduling |
|
Project Administration |
Specifications - Added option to define Material Specification variants that apply to a project Data Extracts - Project, client and contacts
|
Delivery |
|
Form Designer |
Data Sources - Renamed Projects data source to be Project Number Data Sources - Added Project Name data source Data Sources - Added Project Number + Project Name data source Data Sources - Added Project Name + Project Number data source
|
MetaField Patch Log |
2020.5.1 Patch Soil Nuclear Gauge Report - Issue resolved that caused the Test Date value to wrap in the column. Report Designer - Issue resolved that did not hard delete supporting report images when deleted from the report design. Batch Reporting - Issue resolved that prevented the Finalize & Email button from displaying when generating a batch report for reports that do no have a digital signature configuration. Scheduling - Issue resolved when copying work orders which retained links to completed work item forms. LIMS - Issue resolved when using date ranges in filters. LIMS - Issue resolved which prevented scatter plots from plotting material specification thresholds on charts - this issue was present on copied or imported form designs. Project Setup - Modified Date added to the Client data extract
2020.5.2 Patch |